R. López – ITRANSPORTE https://www.revistaitransporte.com TRANSPORT ENGINEERING & CONSULTANCY Sun, 04 Apr 2021 23:18:58 +0000 en-GB hourly 1 https://wordpress.org/?v=5.9.4 Kasteli takes off in Crete https://www.revistaitransporte.com/kasteli-takes-off-in-crete/ Sun, 04 Apr 2021 22:09:52 +0000 https://www.revistaitransporte.com/?p=4600

Following the opening of the new Athens airport, located approximately 30 kilometres from the capital in Spata, in 2001, and the opening up of the remaining airports to public-private management starting in 2015, the next big project for Greek aviation is the construction of the new airport in Kasteli in Crete, which will replace the airport in the capital, Heraklion. With an initial capacity of 8.9 million passengers, it will be Greece’s second largest airport, after Athens. According to the Greek government, this new infrastructure project will generate approximately 7,500 direct jobs once completed, plus another 37,000 indirect jobs in the tourism and commerce sectors.

Heraklion International Airport, is a joint venture between the Greek firm GEK Terna and India’s GMR Airports Limited (GAL), which were awarded the concession contract in 2019. Ineco is developing the design of the new airport for the construction company Terna, which has a period of five years to carry out the works following the signing of the contract, which took place in February 2020. In addition, during the pre-bid phase, the company also drew up the Master Plan for the future airport, which will occupy an area of approximately 600 hectares.

Air transport generates 457,000 jobs in Greece and contributes 17.8 billion euros to its economy, equivalent to 10.2% of Greek GDP, according to a study by IATA, the International Air Transport Association. It is closely linked to tourism, which also accounts for more than 10% of national GDP. Having weathered a long period of recession, the Greek economy returned to positive growth beginning in 2017, which is reflected in airport traffic, which, according to the Hellenic Civil Aviation Authority, recorded a record 65.4 million passengers in 2019, 3 million more than the previous year, an increase of 5 percent. The total number of flights also increased by 3.7%.

Greece broke its tourism record in 2019, with more than 31.3 million visitors, 18% of whom, more than 5 million, travelled to the island of Crete, the country’s largest island and the fifth largest in the Mediterranean. With a population of just over 634,000 inhabitants and covering an area of around 8,500 km2, it is one of the five most visited Greek destinations: its thousands of years of history, cultural and monumental heritage, the Mediterranean climate and the island’s beautiful landscapes and beaches are its main attractions. It is also an important geostrategic enclave due to its location. The local economy is mainly based on agriculture and tourism.

The island has three airport facilities, all located along the northern coast: the small airfield in Sitia, and two international airports, Chania, which was used by 2.9 million passengers in 2019 and shares its installations with a military base, and the Nikos Kazantzakis airport in Heraklion, the island’s capital and the fourth largest city in Greece, with a population of just over 313,000 inhabitants, in the central area of the island, which is also used for both civilian and military purposes.

Activity has been on the rise in recent years, with a steady increase in traffic reaching 8 million passengers in 2019. Today’s installations date back to 1972 and were expanded in 1996 and 2005, although they become particularly congested in summer. In addition to the three civilian airports, 39 kilometres southeast of Heraklion is the Hellenic Air Force base at Kasteli, next to the location of the new airport.

The construction of other major energy and transport infrastructures on the island is also being planned, involving a total investment of more than 3.1 billion euros and with the financial backing of the European Union: the roughly 180-kilometre VOAK highway, which will connect Chania with the town of Agios Nikolaos, and two power supply interconnections with the Greek mainland: Crete-Attica and Crete-Peloponnese.

What Crete’s new airport will look like

The designs currently being developed by Ineco include the following general specifications:

1. Airfield 

  • The runway, class 4E, CAT I, will be 3,200 metres long by 60 metres wide, including margins, plus RESAs (Runway End Safety Areas) at both ends. The existing runway at Heraklion airport has a maximum length of 2,682 metres, meaning that the new facility will be able to accommodate larger aircraft.
  • In terms of taxiways, there will be one parallel to the runway, several rapid exit taxiways and connecting taxiways to the nearby military airport. A connection to an isolated post is also included.
  • The aircraft parking apron will have five MARS positions connected by boarding bridges from the terminal building for class E aircraft, each including two positions for class C aircraft, one remote MARS for class E aircraft, including two for class C. In addition, there are remote positions for class C aircraft, general aviation stands and helicopter stands. The platform will also have a hydrant network supplying all class C and E stands, as well as 400Hz connection points at each of these positions.
  • Pavement will be rigid on the apron, at taxiway intersections and on the first 450 metres from the runway thresholds, and flexible on the runway and taxiways.
  • The designs also include the rest of the airfield’s infrastructure and associated facilities, such as the fire station building, perimeter road and fencing, hydrocarbon separators, lighting, flood barrier and containment basin, firefighter test platform, etc.

2. Land side 

  • The terminal building will occupy an area of between 85,000 and 90,000 m2, divided into four floors: basement, arrivals floor, departures floor and a floor for installations and other purposes.
  • The terminal’s façade will be 200 metres long. The arrivals floor is at apron and land side car park level, while the check-in floor is accessed via a departure deck that is 7.5 metres above ground level.
  • The check-in system will include four islands, with around 80 counters. Security checkpoints, passport control stations and contact boarding gates have been designed on the first floor and remote boarding on the ground floor (both for Schengen and non-Schengen flights).
  • A large area of more than 10,000 m2 has been planned for commercial space, as well as a general aviation hall and another for authorities, among other facilities. The building will qualify for LEED SILVER certification.
  • The main part of the control tower, with the beacon housed at the top, will be approximately 45 metres high and will consist of six floors plus the antenna field.
  • Auxiliary buildings will also be designed: industrial buildings, such as the power station, the power supply substation, a sewage treatment plant, a clean disposal point, a drinking water plant, an installation maintenance building, a handling building, fuel plant, etc. Other buildings include the police station on the land side and the access control buildings on the air side.
  • A surface car park covering approximately 45,000 m2 has been planned to accommodate private vehicles as well as taxis and buses.
  • In terms of road access, a four-lane commercial artery with two main roundabouts is being designed, which will connect to the new highway linking Heraklion to the airport. All of the airport’s internal roads are also being planned.

An island of legend

Crete is the cradle of Europe’s oldest civilisation, the Minoan civilisation (7000 BC), which left its mark with the ruins of the partially reconstructed Palace of Knossos, one of the island’s most important tourist attractions, visited by half a million people every year. Located just 5 kilometres from Heraklion, its complex design is associated with the myth of the maze built by Daedalus for King Minos –son of the god Zeus and the princess Europa, whom he abducted and took to Crete– in order to imprison the bloodthirsty Minotaur, his stepson. In turn, after falling out with Minos, Daedalus devised wings made of bird feathers bound with wax to fly away from the island with his son Icarus. According to the myth, despite his father’s warnings, Icarus ascended too high and the heat of the sun melted the wax, causing him to fall into the sea. In the picture: the Venetian fortress of Koules in the port of Heraklion.

]]>
12 GAP airports https://www.revistaitransporte.com/plans-for-12-mexican-airports/ Tue, 07 Apr 2020 16:25:15 +0000 https://www.revistaitransporte.com/?p=3963

The Mexican airports of Guadalajara, Tijuana, Los Cabos, Puerto Vallarta, Guanajuato, Hermosillo, La Paz, Mexicali, Morelia, Aguascalientes, Los Mochis and Manzanillo, all operated by GAP (the Pacific Airport Group), have just updated their Master Plans to 2034. Ineco first began preparing these plans, which are structured in three five-year phases, in 2003, for the periods 2005-2019, 2010-2024 and 2015-2029.

Growing aviation market

In an aviation market as dynamic as that of Mexico, it is essential to adjust plans to anticipated levels of demand.

In the last five years alone, Mexican air traffic has skyrocketed –with year-on-year growth of more than 10% until 2019, when it grew by 8.4%– due to several factors: the 35% drop in ticket prices due to the trade war between airlines, the drop in fuel prices, the signing of 23 bilateral transport agreements in just four years and the strength of tourism. Within this context, GAP operates five of the 10 busiest airports in the country, with the list topped by Mexico City, with 50.3 million passengers in 2019, and Cancun, with 25.5 million. The Guadalajara airport, with 14.8 million passengers, is in third place.

Air traffic growth at all GAP airports over the past five years, at 12%, is higher than the national average (8%), which is attributable to several factors: the saturation of the international airport in the capital, Mexico City (AICM), which has benefited Guadalajara airport, the cross-border effect at Tijuana airport, and the increase in tourism at the Rivera Nayarit and La Paz airports, which has benefited the Puerto Vallarta and La Paz airports.

Guadalajara is the largest airport, Puerto Vallarta, Los Cabos the most touristic and Tijuana is the main gateway to the US

1 Guadalajara

The Guadalajara International Airport is the third most important in the country and is located in the state of Jalisco. Guadalajara is an important commercial, industrial and tourist centre. In line with the Master Plan, the main actions to be carried out in the coming years will be the construction of a second runway and a new terminal with its associated commercial apron. An increase in the capacity of the general aviation apron and the parking and access facilities is also proposed.

PHOTO_INECO + GAP

2 Tijuana 

General Abelardo L. Rodríguez International Airport is located in Baja California, adjacent to the US border. Passengers departing from San Diego (USA) use the Cross Border Xpress (CBX), which allows them to cross the border without leaving the airport. The Tijuana Plan is currently underway, which includes the construction of a new processing building and the joining of the Alfa and Eco taxiways. The Master Plan aims, within the first five years, to reconfigure and expand the aircraft stands, as well as the security control area in the terminal building, and to reserve an area for cargo, in particular for CBX-Cargo. For the second five-year period, the construction of Dock C and a new control tower.

PHOTO_INECO + GAP

3 Los Cabos 

The airport serves the Los Cabos area –comprised of the municipalities of San Jose del Cabo and Cabo San Lucas– currently one of the most important tourist destinations in the country. 70% of the traffic is international. Among the key actions, the Master Plan proposes, in the short term, to expand the commercial and general aprons, as well as the terminal buildings. For the second five-year period, land is being reserved in the medium term for the construction of a future second runway.

PHOTO_INECO + GAP

4 Puerto Vallarta 

Located in the state of Jalisco, 7.5 kilometres northwest of the city of Puerto Vallarta. The main proposal of the Master Plan is the construction of a new terminal building with an associated apron, parking lots and roads, as well as a reform of the current terminal building.

PHOTO_INECO + GAP

5 Guanajuato

Located in the municipality of Silao (Guanajuato). With 2.7 million passengers in 2019, Guanajuato is the fifth largest city within GAP. In the last five years, average growth has been spectacular, at 15.5%, above the average of 12.1% for GAP. Commercial traffic is mostly domestic. The proposed development includes an expansion in several phases of different areas of the terminal building (departures, arrivals, baggage claim, new boarding gates), as well as the parking aprons (commercial and general aviation).

PHOTO_INECO + GAP

6 Hermosillo 

The airport is located in the municipality of Hermosillo, in the state of Sonora. It serves as an alternate airport to Tijuana. The main development proposals include the enlargement and reconfiguration, over several phases, of the stands on the general aviation apron and, in the short term, of the passenger and baggage claim areas. Also, the control tower is to be renovated, although it does not need to be relocated.

PHOTO_INECO + GAP

7 La Paz

The General Manuel Márquez de León International Airport is located in the state of Baja California Sur. Almost 100% of passenger traffic and commercial operations are domestic. The Master Plan recommends, among other actions, the enlargement of customs, phytosanitary and documentation controls, in the short term; or, in the medium term, of the terminal building, the final waiting room and baggage claim.

PHOTO_INECO + GAP

8 Mexicali

The General Rodolfo Sánchez Taboada International Airport is located in the state of Baja California, about 6.5 kilometres from the US border. Short-term development proposals include increasing the number of documentation counters, installing an X-ray machine and remodelling the general aviation building.

PHOTO_INECO + GAP

9 Morelia

The airport is located 30 kilometres from the city of Morelia, in the north of the state of Michoacán. Following an analysis of demand, it was concluded that the airfield has sufficient capacity for the entire reference period. In the short term, proposed actions include, among others, the expansion of the general aviation apron, as well as the areas for document control, boarding and baggage claim rooms.

PHOTO_INECO + GAP

10 Aguascalientes

The Licenciado Jesús Terán Peredo International Airport is located 24 kilometres south of the city of Aguascalientes. Over the last five years, the average annual growth rate of commercial passengers has been 13.9%, well above the figures reported for the entire group. Among the actions of the Master Plan, it is worth highlighting that during the first five years, the commercial and general aprons were enlarged and remodelled, as well as the passenger area, in particular for baggage claim and document control, and some repairs were made to the beacon in the control tower.

PHOTO_INECO + GAP

11 Los Mochis

The Valle del Fuerte International Airport, or Los Mochis, is located in the state of Sinaloa. Its traffic is almost 100% domestic. The proximity of the airports of Hermosillo and Culiacán –both state capitals– results in competition that affects primarily the development of international traffic. As for the Master Plan, it proposes the remodeling and expansion of the south-west and south-east facades of the existing terminal building, the expansion of the general aviation apron and the reconfiguration of the current seating arrangements.

PHOTO_INECO + GAP

12 Manzanillo 

Also known as Playa de Oro, it is located in the west of the state of Colima. The distribution of commercial passengers is very balanced: 55% of the traffic is domestic and 45% international. No need to increase the capacity of the runway and the commercial aviation apron over the entire time frame of the study was identified. For the terminal building, the expansion and remodeling of the medical clinics, security controls, waiting room and baggage claim area are proposed.

PHOTO_INECO + GAP

GAP, Mexico’s leading operator

GAP was created in 1998 when the Mexican government privatised the administration of 35 of the 58 airports in the national network. The Group was awarded a 50-year concession for 12 of them. That same year, Aena Internacional was established, which has a 33.33% stake in GAP via the company Aeropuertos Mexicanos del Pacífico (AMP), one of GAP’s strategic partners. At present, the 12 Mexican airports have been joined by two more in Jamaica: the Sangster in Montego Bay, since 2015, and the Norman Manley in Kingston, since 2019. GAP has been listed on the Mexican and New York stock exchanges since 2006 and is one of the largest private airport groups in the Americas and the largest in Mexico, with a market share of 26.3% of total traffic. In total, in 2019 it processed 48.7 million passengers, 8.4% more than the previous year.

GAP passenger growth 2019 vs 2018

SOURCE_GAP FORECASTS AS OF JANUARY 2020

WHAT IS A MASTER PLAN?

A Master Plan is the document that constitutes the main planning tool for the development of an airport and governs its development over different time frames. It takes into account its geographical and socio-economic environment, based on the current situation. Since traffic and expected demand are constantly evolving due to multiple factors, they need to be updated regularly. Master Plans involve two distinct planning figures:

  • ‘Proposed development’, which includes the necessary works to adapt airport capacity to foreseeable demand in the short, medium and long term. Works are planned so that they are ready when needed, and are distributed over three five-year periods between 2020 and 2034 (five-year periods).
  • From the final year, 2034, the ‘maximum possible development’, considers a longer time frame, with the aim of defining a ‘reserve area’ for the future development of the airport.

Within the ‘proposed development’, all plans include an aeronautical easement study, a section on environmental measures, the noise footprint of each airport, a preventive maintenance plan for the facilities, an accessibility study in accordance with Mexican legislation, and a proposal for tariffs calculated on the traffic units.

]]>