DFCCIL – ITRANSPORTE https://www.revistaitransporte.com TRANSPORT ENGINEERING & CONSULTANCY Mon, 02 Sep 2019 06:18:24 +0000 en-GB hourly 1 https://wordpress.org/?v=5.9.4 ERTMS for the Eastern rail freight corridor https://www.revistaitransporte.com/ertms-for-the-eastern-rail-freight-corridor/ Thu, 29 Aug 2019 14:15:04 +0000 https://www.revistaitransporte.com/?p=3654

Ineco will be providing assistance to the state-owned company Dedicated Freight Corridor Corporation of India Limited, part of India’s Ministry of Railways, for the acquisition of ETCS/ERTMS level 1 signalling systems for the Eastern Dedicated Freight Corridor, one of the two that are being built, totalling 3,358 kilometres. The 1,300-kilometre Eastern corridor is divided into two sections: Dadri-Khurja-Bhaupur-Allahabad-Mughalsarai-Sonnagar (896 km) and Sahnewal-Pilkhani-Khurja (404 km). The project is being financed by the World Bank.

]]>