Mexico – ITRANSPORTE https://www.revistaitransporte.com TRANSPORT ENGINEERING & CONSULTANCY Tue, 07 Sep 2021 12:59:29 +0000 en-GB hourly 1 https://wordpress.org/?v=5.9.4 New Galileo Information Centre https://www.revistaitransporte.com/new-galileo-information-centre/ Tue, 31 Aug 2021 16:33:27 +0000 https://www.revistaitransporte.com/?p=4890

Since 2 June, the European satellite navigation system, Galileo, has had a new Information Centre in Mexico City, located in the facilities of the National Autonomous University of Mexico (UNAM).

The objectives of the centre, similar to others existing in different parts of the world, such as Brazil –in which Ineco is also involved– and Chile, are to promote and disseminate Galileo in its geographical area (Mexico, Central America and the Caribbean), as well as to monitor local initiatives for use in different fields and to provide training in satellite navigation, bringing together industrial, institutional and university/research sectors.

Ineco will support Telespazio, the project coordinator, in tasks related to market analysis and stakeholder identification, as well as in establishing industrial collaborations between European and Latin American partners. The project will run for three years.

This centre contributes to the European Commission’s space outreach activities to promote EU Space Programmes and encourage their use in the Latin American market.

]]>
On the rise https://www.revistaitransporte.com/on-the-rise/ https://www.revistaitransporte.com/on-the-rise/#respond Tue, 02 Feb 2016 18:40:14 +0000 http://www.revistaitransporte.com/en/trayectoria-ascendente/

Four million passengers in 2016: this is the growth forecast for the Rafael Núñez airport in Cartagena de Indias according to SACSA, the concession company. Majority-owned by the Spanish company Aena Internacional, in 2011 SACSA embarked on a project to improve and expand airport facilities, both on ground and in the air, in order to adapt airport capacity to the growing demand. Ineco recently updated the airport’s Master Plan which plans for expansion work until 2020 and has also designed and coordinated construction work (see IT48). Five years ago, work began on passenger terminal building renovations and expansion; work then continued on the design and surveillance of work on the runway, aprons, the perimeter road and the new FBO terminal for general aviation services.

The increase in traffic at the airport is associated with the tourism and industrial activity in this city –located on the coastline of the Caribbean Sea–, whose characteristic, walled historic quarter has been a UNESCO World Heritage Site since 1984. The city stands out as a domestic holiday destination, and although the number of international arrivals has increased, the majority of the city’s air traffic is mainly domestic with connections to the capital, Bogotá, as well as to main cities such as Medellín and Cali. In terms of international flights, top destinations include southern Florida in the United States in addition to Chile, Venezuela and Spain.

In order to drive the tourism sector, the airport operator and local entities such as Corporturismo and the Cartagena City Council are committed to implementing additional long-distance routes both to North America –the city’s main source of outbound tourism– and to Europe –especially to Germany and Spain. Airlines are thus operating larger aircrafts, in turn requiring airports to provide greater capacity as well as increased safety and security –both operational and physical. Since all work must be carried out without interfering with airport operations, Ineco also conducted a study on the different stages of construction in order to minimise the effects as much as possible.

Greater passenger and aircraft capacity

Thus, the construction work that was carried out at Rafael Núñez airport met these requirements: the current terminal building which was expanded from 2011 to 2013 has grown from 10,491 m2 to 19,370 m2. Expansion of the international hall is currently under way. The runway in addition to the main and secondary (or ECO) aprons were repaved between 2013 and 2014 to repair damaged areas and to increase their load bearing capacity. The axis of the turnaround area was modified to make it easier for large aircrafts to move around, and signalling and traffic guidance equipment was also improved.

With regard to the runway, Ineco designed and coordinated the installation of an asphalt mix that had never before been used in Colombia: a discontinuous, BBTM-11 bituminous mixture (with additional fibres) in a 4-cm screed used on 1,740 metres of the runway’s 2,540 total metres. The asphalt not only improves friction conditions on the wearing surface, but it also facilitates drainage and prevents hydroplaning.

On both aprons, a P-401 bituminous hot mixture with a maximum aggregate size of ¾” was used with a BMIII modified asphalt, with varying thicknesses of 5 to 12 centimetres. The landing gear stop-way was also reinforced with 33-cm concrete slabs. Since there are fewer demands with regard to reinforcements on the perimeter road and pedestrian areas, a MDC-2 bituminous hot mixture with B60/70 asphalt was installed.

General aviation on the rise

In addition to the aforementioned interventions which are of vital importance in terms of aircraft safety, the increase in general aviation traffic was kept in mind. Private and military flights represent more than 90% of traffic at this airport, while the remaining percentage is represented by executive flights, school flights, etc. Although general aviation represents less than 1% of the total passengers who use this airport, it corresponds to 30% of airport operations and is expected to grow an average of 3.9% by 2020, totalling some 26,000 passengers and 14,000 operations.

Therefore, construction work was carried out on a new FBO general aviation terminal in 2014 (Fixed Base Operator, a company from the United States in this case), as agreed upon in the draft that had previously been drawn up by Ineco. The new terminal, located in the eastern part, boasts three different areas: airport authority, border control and entry/exit of passengers and baggage; a surveillance area that covers access areas both to and from air and ground, as well as security checkpoints; and a passenger waiting area.

The project included the construction of a new, stand-alone building with an electrical substation, a hydraulic pump room and a drinking water supply in addition to a handling office. Shared with the secondary apron, a new perimeter road was also constructed with direct access from Vía del Mar, the road that connects Cartagena de Indias with Barranquilla.

The growth forecast predicts that Rafael Núñez airport will see four million passengers in 2016

Ongoing work

Rescue and fire fighting services (RFFS) are fundamental elements when it comes to increasing an airport’s capacity. Aeronautics and airline regulations require that the capacity of these services must be rigorously determined by the size (total length and fuselage width) of the aircrafts that normally operate at the airport. Therefore, airports are categorised on a scale of 0 to 10; Rafael Núñez airport falls into category number 7, meaning that this airport would need a minimum of two fire-fighting vehicles, one fire chief and four firefighters.

Nonetheless, the new facilities designed by Ineco provide for the possibility, also foreseen in the regulations, of increasing these resources if, with prior notification, the airport needed to occasionally accommodate aircrafts corresponding to higher categories. For this reason, airport sheds have space for four vehicles: three fire engines and one light-weight commanding vehicle.

Seeing as this airport operates 24 hours a day, the RFFS requires staff to cover three shifts; thus, the new building has the appropriate facilities for said staff to rest in addition to offices, warehouses, technical areas and a car park. In front of this building there will be a paved clear zone that will allow for aircrafts to transition to the military area. Additionally, there will be two water deposits each containing 30,000 litres of water supply for the fire engines, and said fire engines will also be provided with a new access road, thus facilitating their arrival to the runway in under three minutes. Ineco is overseeing the construction work and is also monitoring compliance with the Operational Safety Plan.

Another ongoing project coordinated and monitored by the company includes the enlargement of the runway safety strip; in some areas, this strip does not meet the required distance of 75 metres between the runway axis and the border of the airport. To meet this requirement, ground is being gained from the area of vegetation by reinforcing it with 5-metre long micropiles.

Colombia’s fourth most important airport

Rafael Núñez airport has seen its traffic volume quadrupled since 2004 and is currently the fourth most important in Colombia behind El Dorado airport in Bogotá, Alfonso Bonilla Aragón airport in Cali –Ineco worked on both of these airports (see IT46 and 48)– and José María Córdova airport in Rionegro. In 1996, the Colombian company Sociedad Aeroportuaria de la Costa S.A. (SACSA) took over management of the airport, and the Spanish company Aena Internacional entered into the picture two years later after acquiring 37.89% of the capital. Aena Internacional is also a partner operator. Aena Internacional participates in the management of 15 airports in three different countries: one in the United Kingdom (Luton), 12 in Mexico (Grupo Aeroportuario del Pacífico) and two in Colombia: one in Cali and one in Cartagena de Indias.
]]>
https://www.revistaitransporte.com/on-the-rise/feed/ 0
76/EI058: safety with identity card https://www.revistaitransporte.com/76ei058-safety-with-identity-card/ https://www.revistaitransporte.com/76ei058-safety-with-identity-card/#respond Tue, 02 Feb 2016 18:35:52 +0000 http://www.revistaitransporte.com/en/76ei058-seguridad-con-dni/

How can we ensure that a taximeter is reliable or that a nuclear facility is safe, that a bulletproof vest is really bulletproof or that the MOT that reviews a vehicle does not act arbitrarily? In Spain, more than 1,600 entities ensure that many products, procedures and services available in the market comply with the regulations of their respective sector. A Spanish government body, the National Accreditation Entity (ENAC), is responsible for authorising who guarantees the safety of consumers and end users. Entities must renew their accreditation every year, demonstrating that they comply with the strict requirements of independence, rigour and transparency that are required for this work.

Rail lines

The wide range of products and services subject to receiving a certification endorsed by an ENAC entity covers any type of production and different types of entities, such as testing or calibration laboratories, inspectors, or certifiers and environmental verifiers from practically any sector: industry, energy, environment, health, agriculture and food, research, development and innovation, telecommunications, tourism, services, construction, transport, etc.

The inspection activity of Ineco falls within the latter, specifically within railway, and in 2009 it obtained its first ENAC accreditation as an ‘independent safety assessor’ with the number 76/EI058. In 2015, it was renewed and extended to the fields of rolling stock, energy, infrastructure, maintenance and exploitation and traffic management. The company has a multidisciplinary team consisting of professionals accredited by ENAC. The work of the entities certified by ENAC, moreover, is not only valid in Spain, but also in the over 70 countries with which it has mutual recognition agreements, including the European Union, United States, Canada, China, Japan, Australia, Brazil, India, United Arab Emirates and Mexico, amongst others.

Why an independent safety assessment?

In addition to rolling stock, since the beginning of rail at the end of the 19th century, the main rail elements related to safety have been signalling systems, in order to avoid the greatest risk of all: collisions between trains. From manual signals to lights, to digital systems and radio without physical signals on the tracks –as is the case for ERTMS level 2–, the different control, command and signalling systems (ASFA, LZB, ERTMS, etc.) have evolved to become more complex and sophisticated, always with the objective of guaranteeing the safe circulation of trains.

The current rail lines –conventional and high speed–, are very complex infrastructure that consist of a large number of elements and undergo very extensive legal and technical regulation that requires a high degree of specialisation by the inspectors. From the time they are planned until they are commissioned, European and international regulations require verification that each and every one of the elements and subsystems work correctly, from the simplest, such as the ventilation of a tunnel, to the most complex, such as software.

For this purpose, two types of safety study are carried out. On one hand, risk analyses, in which threats are identified that could bring the system to a potentially dangerous situation and work is being carried out on mitigation measures or barriers to avoid them. They can be carried out in any stage of the project and seek to detect the weak points of the system. Moreover, and on a higher level, there is the type of study known as ISA (Independent Safety Assessment). Unlike risk analyses, ISA can only be carried out by an accredited entity. They are essential to guarantee for a third party –the operator or rail authority– that a new line or modification of an existing line is safe and can begin or continue to be used.

Experience

Ineco has worked for more than a decade carrying out independent safety assessments in the Spanish rail network, a task which it pioneered. It is currently working in Saudi Arabia, for the Haramain project, where it is carrying
out the ISA for on-board ERTMS systems that will equip the Makkah-Madinah line.
]]>
https://www.revistaitransporte.com/76ei058-safety-with-identity-card/feed/ 0