The Málaga Port Authority has commissioned Ineco to prepare a dedicated study on the condition of the crest wall of the Levante breakwater, and to draw up a plan for its repair. The tasks to be carried out include a comparative analysis of the condition of other crest walls of the same structural type, along with an analysis of the repairs that have been done to them and their current condition. Preliminary studies have concluded that higher than anticipated levels of environmental aggression have reduced the structure’s useful life.