Ineco directed the construction work and provided technical assistance to monitor and supervise the improvements that Adif is making to the section of track between Castellbisbal and Martorell in Barcelona Province. In the Martorell tunnel, which is 1,065 metres long, the structure was lowered, renovated and reconditioned in order to install the third rail and adapt it to the standard gauge (1,435 mm).