The Paseo del Bajo project is one of the most important civil works that are being carried out in Argentina. It will connect Buenos Aires-La Plata and Illia highways creating new green spaces in the El Bajo area of Buenos Aires. Its aim is to relieve congestion in the city traffic and to improve the North-South connections with 12 new lanes measuring over six kilometres in length.

Ineco, in collaboration with its local partner AC&A, will inspect the works for the new Paseo del Bajo road in Buenos Aires, in section B, ‘Trinchera semicubierta Sur’, a semi- underground road of 4 lanes intended for heavy vehicles traffic. This new access will allow freight traffic to exit the Buenos Aires-La Plata highway, cross the centre without traffic lights and to enter the port and the Retiro bus terminal directly, substantially improving travel times.

Ineco has already worked in Argentina developing studies for the restoration of the line between San Salvador de Jujuy and La Quiaca.