New AVE section to Elche and Orihuela put into service
On 1 February, the new 54-kilometre section of high-speed track between Monforte del Cid and Beniel –which includes the new stations of Elche Alta Velocidad …
On 1 February, the new 54-kilometre section of high-speed track between Monforte del Cid and Beniel –which includes the new stations of Elche Alta Velocidad …
On 26 October, the Minister for Transport, Mobility and Urban Agenda officially opened the high-speed line in Galicia between Zamora and Pedralba de la Pradería, …
Ineco was involved in the assessment of the integration of the Birmingham to Leeds eastern leg of HS2 with other rail projects in the region, …
With the track assembly work almost completed on the Plasencia-Cáceres section, the commissioning of the first phase of the Madrid-Extremadura-Portuguese Border high-speed line is drawing ever closer.
In July, Carmen Librero, president of Ineco, visited the works being carried out on the high-speed line between Plasencia and Cáceres accompanied by Ana Rojo, …
Accreditation as an Independent Safety Assessor has allowed Ineco to participate in the assessment of the safety processes applied by Adif to numerous service commencements, …
The construction works on the AVE high-speed line between Madrid and Galicia represent one of the greatest technical challenges ever faced by Adif Alta Velocidad: the rugged terrain of the Galician region poses an engineering challenge that requires remarkable precision. In this article, different experts from Ineco and Adif Alta Velocidad describe some of the main works on one of the most complex sections of the line.
On 25 June, the new AVE high-speed line between Madrid and Granada officially opened with an inaugural journey attended by the acting prime minister, Pedro …
With the opening of the high-speed line, the trip between Madrid and Granada will take 2 hours and 45 minutes. The discovery of archaeological remains near Antequera and complex hydrogeology around the town of Loja were the main challenges to overcome in the final section, where Ineco carried out different works for Adif Alta Velocidad.
The company has been awarded two contracts that are part of the Rail Baltica project, a modern high-speed rail corridor that will link the Baltic …